Linden Hof

Independent technical advisory · Solar PV · Battery storage · Hybrid power

Credit decides which projects get financed. Physics decides which ones keep paying.

We review solar, storage and hybrid projects the way the plant will actually run: hour by hour, at site temperature, under the contract you are about to sign. Then we tell you, in numbers, what it means for the money.

Calc sheet · battery energyKolda reference design
Nameplate energy400 MWh
× usable window 0.85340 MWh
× one-way efficiency √0.88 = 0.938319 MWh
Evening block: 100 MW × 3 h300 MWh
Margin at the grid, year 1+6%
Battery fade, 2–3% a yeargone by year 3

Finding. A "400 MWh" battery misses its 300 MWh contract from year 3. Tender about 430 MWh, or price augmentation in before close. Run it with your numbers

700 MWUtility-scale solar data rooms reviewed, 50–200 MW sites
500 MWp + 400 MWhSolar-plus-storage reference design with hourly dispatch
C&I hybridsSolar, battery and drive systems designed and built in Kenya
  • NDA signed before you send documents
  • Fixed fee, agreed upfront
  • Reply within two working days
  • Paid only by you, never by suppliers

Where projects go wrong

The costly gaps sit between documents that each look fine

A yield report, a single-line diagram, a PPA and a financial model are written by different people at different times. We read them against each other. These are the checks that most often change a decision.

PPA ↔ plant

Contracted capacity against installed AC

Modules are rated in DC, contracts in AC, and the export limit is a third number. We have seen inverter capacity sit well below what a PPA committed the plant to deliver.

500 MWp of modules → 414 MWac of inverters → 314 MW export cap. Three correct numbers for three points in the chain. Compare like with like.

Yield ↔ debt

A P90 that sits too close to P50

Lenders size debt on P90. If a report shows P90 only 2–3% below P50, an uncertainty term has usually been left out, often year-to-year weather.

Combined uncertainty = √(4² + 5² + 3² + 3² + 1²) = √60 ≈ 7.75%
P90 = P50 × (1 − 1.282 × 0.0775) ≈ 0.90 × P50

Motor ↔ inverter

Motor starts on an inverter-fed bus

On the grid, a large motor start is a non-event. On inverters alone, the same start can trip every drive in the plant. Average load does not size the inverter.

315 kW motor started direct on line: 6.5 × rated ≈ 2.5 MVA
Dip ≈ 2.5 ÷ 100 MVA of grid = 2.5%
Dip ≈ 2.5 ÷ 10.7 MVA of inverters = 23%

Warranty ↔ COD

Cover that starts before the plant does

Equipment warranties often start at shipment. Batteries sitting in a hot port age before they are installed. The EPC contract has to close the gap to commercial operation.

A 10-year warranty that starts at shipment, with COD 6 months later, gives the owner 9.5 years of cover. We check who carries the gap.

Who we work with

Four ways in

Lenders, funds and arrangers

Before the credit committee

A fixed-fee technical check on a single loan, or a fast, independent read of a data room. Findings ranked by what they do to cash, written for a credit paper.

Pre-commitment review →

Businesses buying solar

Before you sign an EPC proposal

Independent review of solar, battery and hybrid quotes against your load, your process and the contract. Strongest on 24/7 plants with large motors and generators.

Quote and design review →

Developers and owners

On the owner's side of the table

Design basis, employer's requirements, bid evaluation, guarantees and acceptance tests, so the plant you receive is the plant you specified.

Owner's-side support →

Engineering and advisory firms

Your team in East Africa

Local associate for site visits, grid and regulatory input, and first-pass document review on your mandates in Kenya and the region.

Local associate →

Comparing solar or battery quotes? Our checklist sets out 12 questions every installer should be able to answer in writing.

Read the checklist →

What you receive

Every finding comes with its number, its cost and its fix

"The battery margin looks thin" is an opinion. A finding states the physical effect, the money effect, the effect on debt service, who carries the risk and what resolves it. Every Linden Hof review is written this way, so it can go straight into a credit paper or a negotiation.

F-07MajorBattery energy · Kolda reference design
Physical
319 MWh deliverable against a 300 MWh block: 6% margin, used up by fade in about two years
Money
Firm block missed from year 3; penalties or lost capacity payments
Finance
Fix adds about USD 7.5m CapEx; minimum DSCR 1.38 → 1.35
Risk holder
Sponsor, unless the EPC guarantees usable energy at the grid
Resolution
Tender about 430 MWh at day one, with pre-built augmentation bays

Getting started

How it works

  1. 1

    Tell us the decision

    Use the form or WhatsApp. Say what you are reviewing and when you need to decide.

  2. 2

    Get a fixed proposal

    A free 30-minute call, then scope, fee and delivery date in writing within two working days.

  3. 3

    Receive findings you can act on

    A ranked findings register and a one-page summary, walked through with your team.

Reviewing a solar or storage project?

Tell us what you are deciding and when. We reply within two working days.